fbpx
星期五, 10 月 4, 2024

Improving traffic flow on Ti Rakau Dr

Improved journey times are on the way for everyone who uses Ti Rakau Drive.

Auckland Transport (AT) is proposing to change intersection layouts, put in peak hour bus lanes and upgrade pedestrian and cycling facilities. These measures will improve journey times on Ti Rakau Drive and nearby streets.

This work is part of AT’s wider plan to improve connectivity, reliability, shorten journey times and provide practical alternatives for getting to, from and around East Auckland. The plan also includes the rollout of the East Auckland New Network bus routes from December and AMETI Eastern Busway which is expected to be completed in 2026.

Randhir Karma, AT’s Group Manager Network Management and Safety says congestion in Auckland is getting worse. “We want to deal with congestion now, so we are targeting short term improvements.”

Ti Rakau Drive is one of the busiest roads in East Auckland. On average 35,000 vehicles travel this road every day. “These huge numbers mean there is traffic congestion and frustration for people using the road. We want to shorten queues and improve reliability and punctuality of bus services.

“We’re looking at peak time bus lanes and intersection changes to make Ti Rakau Drive a safer and more pleasant journey for everyone who uses it.”

AT is currently undertaking community consultation on this proposal which has six separate parts:

  • Putting in peak hour bus lanes on Ti Rakau Drive, between Wheatley Avenue and Gossamer Drive.
  • Removing the right turns at the Edgewater Drive (eastern end) intersection with Ti Rakau Drive.
  • Adding two right turn traffic lanes into Gossamer Drive from Ti Rakau Drive.
  • Extending the two left turn traffic lanes into Botany Road from Ti Rakau Drive.
  • Extending the left turn lane into Ti Rakau Drive by changing Te Irirangi Drive’s layout at the Countdown entrance.
  • Adding two left turn traffic lanes into Chapel Road from Ti Rakau Drive.

More information on the proposal and design plans are available on the project webpage: http://at.govt.nz/haveyoursay.

Over the next few weeks, residents and business in the immediate area will receive a flyer in the mail outlining the proposal and providing an opportunity to give feedback. A public open day will be held on Saturday 28 October, 11am-3pm, at the Botany Town Centre (opposite Muffin Break), 588 Chapel Road, East Tamaki. This is an opportunity for the public to discuss the proposal with the project team.

The public consultation period will close at midnight on Sunday 12 November. Feedback will be analysed and available in early 2018. If the decision is made to proceed with the proposal, construction is expected to start in late 2018.

By clicking to accept for Times Online to be translated into Mandarin, you accept and acknowledge that it has been translated for your convenience using 3 rd party translation software. No automated translation is perfect, nor is it intended to replace human translators and are provided "as is." No warranty of any kind, either expressed or implied, is made as to the accuracy, reliability, or correctness of any translations made from English into Mandarin. Some content (such as images, videos etc.) may not be accurately translated due to the limitations of the translation software. The official text is the English version of the website. Any discrepancies or differences created in the translation are not binding and have no legal effect and should not be relied on by you for any decision-making purposes. If any questions arise related to the accuracy of the information contained in the translated website, refer to the English version of the website which is the official edited version.

点击同意将《时代在线》翻译成中文,即表示您接受并确认,该翻译是使用第三方软件为您方便起见而 提供的。请注意自动翻译并非完美无缺,也不旨在取代人工翻译,只能作为参考而已。对于英文到中文 的任何翻译的准确性、可靠性或正确性,我们不提供任何明示或暗示的保证。由于翻译软件的限制,某 些内容(如图片、视频等)可能无法准确翻译。   英文版本是本网站的官方正式文本。翻译中产生的任何差异或错误均不具有约束力,不具有法律效力, 您不应依赖由自动翻译软件生成的版本做出任何决策。如果对翻译后的网站中包含的信息的准确性有任 何疑问,请参阅本网站的官方编辑英文版本。

- 广告
- 广告

更多信息来自《泰晤士报在线

- 广告

最新

- 广告
- 广告