fbpx
星期二, 12 月 17, 2024

Locked down…again!

Adele White is chair of Howick Local Board

Members of the Howick Local Board quickly adjusted their way of working to comply with the restrictions of Covid-19 Level 3 and currently 2.5.

Workshops and business meetings have continued through the use of Skype, and face-to-face meetings and events postponed until restrictions ease. Again, it has been wonderful to see our locals offering help to each other and generously supporting our local businesses.

Park and playground signage for Covid-19

Auckland Council have installed signage on parks, beaches and playground that advises appropriate usage for each of Covid-19 Levels 1 to 4. This ensures that restrictions to ensure public safety are in place as we move from one level to another.

20 questions on water

In recent meetings with two resident and ratepayer groups, it became evident that many of the concerns of local residents are around issues relating to water. On Wednesday, August 26, the Local Board, with the assistance of Local Board Services staff, hosted an online forum during which subject matter experts from Healthy Waters, Watercare, Auckland Council’s Research and Evaluation Unit (RIMU) and Council’s Resource Consents Team addressed questions submitted by the two groups.

Some of the topics covered were stormwater and sewerage infrastructure, marine life monitoring, riparian planting, monitoring of water at beaches and waterways and legal issues around Unitary Plan compliance. This forum is available online, using this link: bit.ly/howicklocalboard

From Auckland Transport

Murphys Road, Flat Bush – between Ormiston Road and Flat Bush Road, has now reopened to traffic as a four-lane road. Recognised as an area that will experience significant development in the coming years the growth of Flat Bush growth needed to be supported by building or improving arterial roads, bus routes, pedestrian facilities, and cycling facilities. The new road provides improved access to the numerous new residential developments in this location.

Selwyn Road, Howick, will shortly undergo road rehabilitation – despite tight financial constraints. This will involve renewing the road and fixing related problems. The contractor plans to complete the work in September/October. Some enabling work such as sub-soil drains installation has already been completed as this is usually carried out before major rehabilitation.

Eastern Train Line services between Britomart and Otahuhu will not be running until Sunday, September 20. This is so Kiwi Rail can continue repairs and replacement of tracks. Trains will continue to be replaced with buses.

Adele White is chair of the Howick Local Board

By clicking to accept for Times Online to be translated into Mandarin, you accept and acknowledge that it has been translated for your convenience using 3 rd party translation software. No automated translation is perfect, nor is it intended to replace human translators and are provided "as is." No warranty of any kind, either expressed or implied, is made as to the accuracy, reliability, or correctness of any translations made from English into Mandarin. Some content (such as images, videos etc.) may not be accurately translated due to the limitations of the translation software. The official text is the English version of the website. Any discrepancies or differences created in the translation are not binding and have no legal effect and should not be relied on by you for any decision-making purposes. If any questions arise related to the accuracy of the information contained in the translated website, refer to the English version of the website which is the official edited version.

点击同意将《时代在线》翻译成中文,即表示您接受并确认,该翻译是使用第三方软件为您方便起见而 提供的。请注意自动翻译并非完美无缺,也不旨在取代人工翻译,只能作为参考而已。对于英文到中文 的任何翻译的准确性、可靠性或正确性,我们不提供任何明示或暗示的保证。由于翻译软件的限制,某 些内容(如图片、视频等)可能无法准确翻译。   英文版本是本网站的官方正式文本。翻译中产生的任何差异或错误均不具有约束力,不具有法律效力, 您不应依赖由自动翻译软件生成的版本做出任何决策。如果对翻译后的网站中包含的信息的准确性有任 何疑问,请参阅本网站的官方编辑英文版本。

- 广告
- 广告

更多信息来自《泰晤士报在线

- 广告

最新

- 广告
- 广告