fbpx
星期日, 11 月 17, 2024

Homes in transport project’s path

Te Irirangi Drive in Flat Bush is a key link in the future Botany to Auckland Airport rapid transit project. Times file photo Wayne Martin

People living in part of east Auckland have been told their homes are needed to make way for a major public transport project.

The Times understands residents have received letters from Auckland Transport (AT) stating their properties may be impacted by the preferred route of the Botany to Auckland Airport rapid transit project.

Follow-up emails have also been sent to some locals stating their whole property is required and may be confiscated under the Public Works Act.

However, an AT spokesperson says there’s currently no funding to progress the project to the detailed design and construction phase.

The spokesperson says 475 properties have received letters advising them the project’s “draft designation boundary” affects their property.

Only one local road, Te Irirangi Drive in Flat Bush, is among those impacted, with the rest located in south Auckland.

Botany MP and National Party leader Christopher Luxon says his electorate office was contacted by a constituent about the issue and in response said it would look into the concerns raised.

“The Botany rapid transit project is a key piece of infrastructure to serve the people of east Auckland and AT has determined this is the best route for the project,” Luxon says.

“We appreciate that for some affected residents this will cause considerable disruption and we hope AT is engaging and communicating with affected residents in an open and empathetic manner.”

The project starts at a new interchange in Botany that will connect to the Eastern Busway.

It travels south along Te Irirangi Drive to Great South Road and through Manukau, Puhinui Road and State Highway 20B to the airport.

“The project primarily involves the upgrade and widening of existing transport corridors to provide for a separated bus rapid transit corridor and high quality walking and cycling facilities,” the AT spokesperson says.

“Nine bus rapid transit stations are proposed as part of the project, noting there are 12 proposed overall, with a new Botany Station progressed via the Eastern Busway and two stations progressed within the airport’s precinct.”

The spokesperson says the stations are located in Smales Road, Accent Drive, Ormiston Road and six south Auckland sites.

“There is currently no funding to progress the project into the detailed design and construction phase.

“That means currently no properties are required to be purchased by either AT or Waka Kotahi [NZTA].

“The purchase of the properties tends to be approximately two-three years prior to construction, which is currently estimated in the next 10-15 years.

“Value of the homes is set at the time using fair market value as set out in the Public Works Act.”

The Te Irirangi Drive homes are not the first in recent years to be affected by a local public transport project.

The decision announced by AT earlier this year to have the Eastern Busway dissect Burswood will require the purchase of dozens of homes in that community, much to the dismay of residents strongly opposed to the plan.

By clicking to accept for Times Online to be translated into Mandarin, you accept and acknowledge that it has been translated for your convenience using 3 rd party translation software. No automated translation is perfect, nor is it intended to replace human translators and are provided "as is." No warranty of any kind, either expressed or implied, is made as to the accuracy, reliability, or correctness of any translations made from English into Mandarin. Some content (such as images, videos etc.) may not be accurately translated due to the limitations of the translation software. The official text is the English version of the website. Any discrepancies or differences created in the translation are not binding and have no legal effect and should not be relied on by you for any decision-making purposes. If any questions arise related to the accuracy of the information contained in the translated website, refer to the English version of the website which is the official edited version.

点击同意将《时代在线》翻译成中文,即表示您接受并确认,该翻译是使用第三方软件为您方便起见而 提供的。请注意自动翻译并非完美无缺,也不旨在取代人工翻译,只能作为参考而已。对于英文到中文 的任何翻译的准确性、可靠性或正确性,我们不提供任何明示或暗示的保证。由于翻译软件的限制,某 些内容(如图片、视频等)可能无法准确翻译。   英文版本是本网站的官方正式文本。翻译中产生的任何差异或错误均不具有约束力,不具有法律效力, 您不应依赖由自动翻译软件生成的版本做出任何决策。如果对翻译后的网站中包含的信息的准确性有任 何疑问,请参阅本网站的官方编辑英文版本。

- 广告
- 广告

更多信息来自《泰晤士报在线

- 广告

最新

- 广告
- 广告