fbpx
星期三, 12 月 25, 2024

Join us at the fabulous Moon Festival

The popular Howick Moon Festival is being staged at Barry Curtis Park, off Flat Bush School Road, on Saturday September 10 from 4pm-9 pm. Times file photo Wayne Martin
  • By Adele White, chairperson Howick Local Board

Kia ora!

Moon Festival

Join us at the Howick Moon Festival at Barry Curtis Park, off Flat Bush School Road, on Saturday September 10 from 4pm-9 pm.

Enjoy an evening of culture and tradition at this outdoor family event, also known as Mid- Autumn Festival. The moon, in Chinese tradition, signifies peace, prosperity and family reunion.

There will be music and dance performances with food and craft stalls onsite.

Sports awards

The Howick Local Board was proud to host the Howick Sports Awards at the Pakuranga United Rugby Club last week.

A number of exceptional contributors to sport were acknowledged for their skills and the dedication they gave to local sport over 2021.

Congratulations to all finalists and deserving winners.

Summer play

The playground at Juliet Avenue is currently undergoing a full renewal which includes drainage works within the playground footprint.

This is due to be complete by the end of September, with renewal of the playground at Howick Domain following closely behind with completion due in November.

Update on works

Renewal of the paths within Lloyd Elsmore Park is well underway.

To date, the northern path is 80 per cent completed.

Asphalt will be placed later when the section is dry.

The first section of the main path is also 80 per cent complete and the second section is underway.

Completion time is weather-dependant but aimed at the end of September.

Seawall renewal works at Bramley Drive are now 100 per cent complete and looking fantastic.

Walkway renewal works are currently in progress with planting to follow after the walkway is completed.

Public feedback on Plan Change 78

Submissions are currently being received on Plan Change 78 (National Policy Statement – Urban Development).

Residents can provide their feedback of endorsement or opposition on the new intensification rules until September 29.

There’s significant detail with planning maps showing proposed changes and FAQs on the Auckland Council website. Submissions can be made online.

Howick Local Board grants

Our next funding round is a Quick Response Grant for amounts between $250 and $3000.

Submit your application between October 3-28.

Details including criteria can be found at www.aucklandcouncil.govt.nz/grants.

By clicking to accept for Times Online to be translated into Mandarin, you accept and acknowledge that it has been translated for your convenience using 3 rd party translation software. No automated translation is perfect, nor is it intended to replace human translators and are provided "as is." No warranty of any kind, either expressed or implied, is made as to the accuracy, reliability, or correctness of any translations made from English into Mandarin. Some content (such as images, videos etc.) may not be accurately translated due to the limitations of the translation software. The official text is the English version of the website. Any discrepancies or differences created in the translation are not binding and have no legal effect and should not be relied on by you for any decision-making purposes. If any questions arise related to the accuracy of the information contained in the translated website, refer to the English version of the website which is the official edited version.

点击同意将《时代在线》翻译成中文,即表示您接受并确认,该翻译是使用第三方软件为您方便起见而 提供的。请注意自动翻译并非完美无缺,也不旨在取代人工翻译,只能作为参考而已。对于英文到中文 的任何翻译的准确性、可靠性或正确性,我们不提供任何明示或暗示的保证。由于翻译软件的限制,某 些内容(如图片、视频等)可能无法准确翻译。   英文版本是本网站的官方正式文本。翻译中产生的任何差异或错误均不具有约束力,不具有法律效力, 您不应依赖由自动翻译软件生成的版本做出任何决策。如果对翻译后的网站中包含的信息的准确性有任 何疑问,请参阅本网站的官方编辑英文版本。

- 广告
- 广告

更多信息来自《泰晤士报在线

- 广告

最新

- 广告
- 广告