fbpx
星期六, 10 月 26, 2024

Watercare launches pipe inspections

INSPECTION: Watercare contractors Michael Thompson and Bernie Wallace demonstrate how the device pushes smoke into the network. Times photo Wayne Martin.

Watercare has launched an inspection of public and private wastewater pipes from every house in Mellons Bay in an effort to reduce wet weather overflows.

The work is part of an Auckland-wide programme to decrease the volume of stormwater entering the wastewater network, which is a major contributor to wet-weather overflows.

Since September last year, wet-weather overflows have been problematic for Mellons Bay residents who have been waiting on Watercare to take action.

In heavy rain, the amount of stormwater that drains from an average single roof is the equivalent to the wastewater flows from more than 40 households, said Watercare network manager Anin Nama.

Residents will be notified via a flyer dropped into their letterbox ahead of time to let them know what to expect.

Watercare teams will be testing wastewater pipes, stormwater downpipes and gully traps from around 2000 houses over the next month using a white, cold, non-toxic smoke to pinpoint problems.

Mr Nama said teams will also carry out a visual property-by-property inspection looking for faults or defects, as there are instances when smoke may not identify the problem.

Last week, 15 faults were found across 200 properties where a completed inspection had taken place.

Any houses identified as being non-compliant or with illegal connections will receive a letter from Watercare and Auckland Council to the property owner requesting the problem to be fixed as soon as possible.

Defect notices will come out within two weeks of inspection, said a Watercare representative.

The council will then seek a statement proving the repairs have been done, or alternatively the property owner can provide council with a photograph as evidence of completion.

Watercare representative Maxine Clayton said she hopes to see property owners step up to do their part toward fixing the problem.

“People tend to think council should do it all…but everyone has a part to play in this,” she said.

Within the month, a new level sensor will also be installed inside a manhole at Mellons Bay beach to provide Watercare with forewarning when an overflow is about to occur.

By clicking to accept for Times Online to be translated into Mandarin, you accept and acknowledge that it has been translated for your convenience using 3 rd party translation software. No automated translation is perfect, nor is it intended to replace human translators and are provided "as is." No warranty of any kind, either expressed or implied, is made as to the accuracy, reliability, or correctness of any translations made from English into Mandarin. Some content (such as images, videos etc.) may not be accurately translated due to the limitations of the translation software. The official text is the English version of the website. Any discrepancies or differences created in the translation are not binding and have no legal effect and should not be relied on by you for any decision-making purposes. If any questions arise related to the accuracy of the information contained in the translated website, refer to the English version of the website which is the official edited version.

点击同意将《时代在线》翻译成中文,即表示您接受并确认,该翻译是使用第三方软件为您方便起见而 提供的。请注意自动翻译并非完美无缺,也不旨在取代人工翻译,只能作为参考而已。对于英文到中文 的任何翻译的准确性、可靠性或正确性,我们不提供任何明示或暗示的保证。由于翻译软件的限制,某 些内容(如图片、视频等)可能无法准确翻译。   英文版本是本网站的官方正式文本。翻译中产生的任何差异或错误均不具有约束力,不具有法律效力, 您不应依赖由自动翻译软件生成的版本做出任何决策。如果对翻译后的网站中包含的信息的准确性有任 何疑问,请参阅本网站的官方编辑英文版本。

- 广告
- 广告

更多信息来自《泰晤士报在线

- 广告

最新

- 广告
- 广告